top of page

FlowStop™  Applications

Pump & Dump

  • During riser-less drilling when pumps are stopped heavy mud will u-tube from drill string to the annulus
  • Difficult to visually distinguish shallow flow from u-tubing 
  • Need to fill drill pipe after every connection
  • Uncessary loss of time and mud
 Calculate your cost savings with FlowStop™

 - Managed Pressure Drilling

  • Stop flow when drill pipe is overbalanced with resepct to annulus
bottom of page