top of page

FlowMax Deepwater Applications

Hole Cleaning

Annular velocity is the single most important parameter in the hole cleaning process.  FlowMax​™ increases the AV at a selected point  in the drillstring and greatly improves hole cleaning.

 - Reduce Bottoms Up Time 

Reduce bottoms up time when flow rate is restricted by BHA​
 50% Time Savings​

 - Wellhead Jetting 

  • Jet wellhead on trip out of hole ​
  Save Dedicated Jetting Trip

 - Wellbore Cleanout  

  • Use multiple tools in tandem to increase displacement efficiency and reduce bottoms up time
  • Ability to spot pill on bottom with tool closed, increase flow rate once pill above tool
  • 750 gpm to bottom of BHA

  • Boost 750 gpm via 1st Stage FlowMax to 13 5/8” annulus

  • Boost 500 gpm via 2nd Stage FlowMax at Wellhead

  • Put dedicated pump on boost line to boost Riser flow by 500 GP

 Reduced Bottoms Up Time
bottom of page